NO. | Beijing Time (UTC+8) | Type | Talk Title | Speaker | Affiliation |
---|---|---|---|---|---|
09:00-10:00 | Take a vehicle |
Go to the conference room near the Sichuan laboratory of Beijing Sinoconfix Technology Co., Ltd. |
|||
10:00-12:00 | Short Course |
Conference Room: 1. Watch warm-up videos 2. Short Course <Design and Construction of Rock-Filled Concrete Dam> 3.Watch the live stream of the reservoir on site |
Feng Jin | Department of Hydraulic Engineering,Tsinghua University | |
12:00-13:30 | Tea break |
Light meals and rest |
NO. | Beijing Time (UTC+8) | Type | Talk Title | Speaker | Affiliation |
---|---|---|---|---|---|
13:30-13:35 | Take a vehicle |
Go to the laboratory by bus |
|||
13:35-16:00 | Short Course |
Laboratory: 1.Observation and practical application of the pouring mechanism and intelligence of RFC. 2.Observation and practical application of the pouring mechanism of underwater self-protection concrete. |
Feng Jin | Department of Hydraulic Engineering,Tsinghua University | |
16:00-17:00 | Take a vehicle |
Return to the hotel by bus, end. |