NO. | Beijing Time (UTC+8) | Type | Talk Title | Speaker | Affiliation |
---|---|---|---|---|---|
08:45-09:00 | Take a vehicle |
Gathering at the main lobby of Chengdu Century City New International Conference Center |
|||
09:00-10:00 | Take a vehicle |
Go to the conference room near the Sichuan laboratory of Beijing Sinoconfix Technology Co., Ltd. |
|||
10:00-10:10 | Topic films |
Watch warm-up videos |
|||
10:10-11:10 | Courses |
Design and construction of rock-filled concrete dam
Feng Jin
Department of Hydraulic Engineering,Tsinghua University
|
|||
11:10-12:10 | Courses |
Watch the live stream of the reservoir on site
Feng Jin
Department of Hydraulic Engineering,Tsinghua University
|
|||
12:10-13:30 | Lunch |
Lunch break |
|||
13:30-13:35 | Take a vehicle |
Go to the laboratory by bus |
|||
13:35-15:00 | Courses |
Observation and practical application of the pouring mechanism and intelligence of RFC
Feng Jin
Department of Hydraulic Engineering,Tsinghua University
|
|||
15:00-16:00 | Courses |
Observation and practical application of the pouring mechanism of underwater self-protection concrete
Feng Jin
Department of Hydraulic Engineering,Tsinghua University
|
|||
16:00-17:00 | Take a vehicle |
Return to the hotel by bus, end. |