Mr J.M Bocquet has 34 years professional experience with Tractebel Engineering France. He has been involved in the design and the assistance during construction of numerous hydroelectrical projects, in more than 30 different countries, mainly in Africa.
Presently, Mr Bocquet is the Project Manager of the 115 MW Gribo-Popoli hydropower project in Ivory Coast and the pumped storage power plant of Abdelmoumen (350 MW) in Morocco.
Mainly based in Paris for design study, he has also a wide experience in construction gained during site resident in different country, mainly Ethiopia, Swaziland, Ivory Coast, Tunisia and Burkina Faso.”
Vidéos de conférences:0
Résumé de la thèse:1
172
0
0
Date | Temps | Lieu de réunion | Session | Rôles | Sujet |
---|---|---|---|---|---|
- |