NO. | Beijing Time (UTC+8) | Type | Talk Title | Speaker | Affiliation |
---|---|---|---|---|---|
09:00-09:10 | Chairman |
Introduce the guests
Fuqiang Wang
China Renewable Energy Engineering Institute
|
|||
09:10-09:35 | Speech |
Leader Speech
Alberto Marulanda Posada
Ingetec /
Jianping Zhou
Power Construction Corporation of China (POWERCHINA) /
Shunxiang Zheng
Huadian Jinsha River Upstream Hydropower Development CO., Ltd. /
Yong Xia
Power china chengdu /
Dunfeng Zong
Power Construction Corporation of China (POWERCHINA)
|
|||
09:35-10:05 | Invited presentations |
Development and innovation of CFRD construction technology
Zongliang Zhang
Power Construction Corporation of China
|
|||
10:05-10:35 | Invited presentations |
A historical perspective: the development and evolution of CFRDs
Alberto Marulanda Posada
Ingetec
|
|||
10:35-10:50 | Group photo |
Group Photo |
|||
10:50-11:20 | Invited presentations |
A 40 years review on experience and practice of CFRD
Zeyan Yang
China Renewable Energy Engineering Institute
|
|||
11:20-11:50 | Invited presentations |
A 40 years review on experience and practice of CFRD
Qigui Yang
Changjiang Survey, Planning and Design Co.,Ltd.
|
|||
11:50-13:00 | Lunch |
Lunch break |
|||
13:00-13:20 | Keynote Report |
Ecological synergy, technology empowerment, innovative dam building - practical application at China Huadian's Lawa hydropower station on the upper Jinsha River
Xiongan Fan
Huadian Jinsha River Upstream Hydropower Development CO., Ltd.
|
|||
13:20-13:40 | Keynote Report |
Experiences in the design, construction, and performance of CFRDs in Mexico
Humberto Marengo
NATIONAL COMISSION OF WATER
|
|||
13:40-14:00 | Keynote Report |
Characteristics and key construction technologies of the lawa hydropower station dam
Jiangyang Pan
zhongnan engineering corpration limited
|
|||
14:00-14:20 | Keynote Report |
Instrumentation in CFRDs: current practices and innovative approaches |
|||
14:20-14:40 | Keynote Report |
Deformation control-transformation-coordination technology for high face rockfill dams
Zhenggang Zhan
POWERCHINA GUIYANG ENGINEERING CORPORATION LIMITED
|
|||
14:40-15:00 | Keynote Report |
The latest updates in CFRD: an overview of the new bulletin
Camilo Marulanda
INGETEC
|
|||
15:00-15:20 | Keynote Report |
Key Technologies for Intelligent Construction of High CFRDs
Gaojian Wu
SINOHYDRO BUREAU 5 Co.,LTD
|
|||
15:20-15:40 | Keynote Report |
Seismic design aspects of the 156m high Rudbar Lorestan ECRD
Martin Wieland
AFRY Switzerland Ltd.
|
|||
15:40-15:50 | Tea break |
Coffee break |
|||
15:50-16:10 | Keynote Report |
The Long-term operational characteristics and implications of the first stage concrete-graded rockfill dam of Tian Tian Bridge Dam project
Yelin Feng
POWERCHINA KUNMING ENGINEERING CORPORATION LIMITED
|
|||
16:10-16:30 | Keynote Report |
High-quality construction and practice of the special high concrete slab rockfill dam of the Yulong Kashi Hydropower Station project
Ying Yu
CHINA GEZHOUBA GROUP CO.,LTD.
|
|||
16:30-16:50 | Keynote Report |
The technological innovations of Houziyan CFRD design and construction
Yongguo Zhu
CHN ENERGY Dadu River Hydropower Development Co., Ltd.
|
|||
16:50-17:10 | Keynote Report |
Analysis of deformation control and monitoring data of concrete face rockfill dam of Houziyan hydropower station on Dadu River |
|||
17:10-17:30 | Keynote Report |
Innovative construction technologies and applications for the Jiangping River CFRD |
|||
17:30-17:50 | Keynote Report |
Introduction to the dam construction technology of the Dashixia concrete-faced rockfill dam in Xinjiang
junfang zhou
Xinjiang Gezhouba Dashixia Water Conservancy Hub Development Co., Ltd.
|
|||
17:50-18:00 | Summary |
Conclusion Speech
Camilo Marulanda
INGETEC
|