NO. | Beijing Time (UTC+8) | Type | Talk Title | Speaker | Affiliation |
---|---|---|---|---|---|
14:00-14:20 | International Sympsosium Presentation |
Research on integrated platform architecture for dams design and construction based on BIM |
Zhiming Liu | MWR General Institute of Water Resources and Hydropower Planning and Design | |
14:20-14:40 | International Sympsosium Presentation |
Monitoring large concrete dams using deterministic models: a case study of the Sayano-Shushenskaya HPP |
Sergey Machekhin | PJSC RusHydro | |
14:40-15:00 | International Sympsosium Presentation |
Intelligent temperature control technology and application practice for concrete dams in China |
Yi Liu | China Institute of Water Resources and Hydropower Research |
NO. | Beijing Time (UTC+8) | Type | Talk Title | Speaker | Affiliation |
---|---|---|---|---|---|
15:00-15:10 | International Sympsosium Presentation |
Sensory to Long-term Memory (SLM) machine learning for the estimation of hydrological response in real time dam operation during flood events |
Tae-Ho Kang | K-water Research Institutue | |
15:10-15:20 | International Sympsosium Presentation |
Stability analysis and safety monitoring of dam and reservoir bank in hydropower engineering |
Chun'an Tang | Chengdu University of Technology | |
15:20-15:30 | Discussion |
Discussion |
NO. | Beijing Time (UTC+8) | Type | Talk Title | Speaker | Affiliation | ||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
15:50-16:00 | International Sympsosium Presentation |
Multi-modal Large Model Construction Technology for Water Diversion Project Safety |
Xuemei Liu | NCU | |||||||||||
16:00-16:10 | International Symposium Presentation |
Digital Transformation of Dams: Innovation and Efficiency through BIM |
|||||||||||||
|
|||||||||||||||
16:10-16:20 | International Sympsosium Presentation |
Intelligent Analysis of Long-Term Performance of Embankment Dams: Exploration of Monitoring, Prediction and Evaluation |
Gang Deng | China Institute of Water Resources and Hydropower | |||||||||||
16:20-16:30 | International Sympsosium Presentation |
The state of art monitoring of 169 m high clay cored rockfill Atatürk Dam |
Ozgen Kokten | TEMELSU International Engineering Services Inc. | |||||||||||
16:30-16:40 | International Sympsosium Presentation |
Investigation of construction safety using three-dimensional computational fluid dynamics for dam redevelopment work |
Mitsuhiro Omata | Obayashi Corporation | |||||||||||
16:40-16:50 | International Sympsosium Presentation |
Analysis of high-value realisable technology paths for embankment dam construction and operation under the intelligent vision |
Fawang Guo | PowerChina Guiyang Engineering Corporation Limited | |||||||||||
16:50-17:00 | International Sympsosium Presentation |
Dam safety management: the need for technological solutions in current times |
Giani Aparecida Santana Aragão | Pimenta de Ávila Consultoria | |||||||||||
17:00-17:10 | International Sympsosium Presentation |
Harnessing technology for remote dam detection to improve global data on dams and reservoirs |
Kimberly Lyon | The World Bank | |||||||||||
17:10-17:20 | International Sympsosium Presentation |
Research and practice of intelligent construction system of Lawa Hydropower Station |
Songtao Peng | Huadian Jinsha River Upstream Hydropower Development CO., Ltd. | |||||||||||
17:20-17:30 | International Sympsosium Presentation |
Implementation of a new dam monitoring platform for 23 large dams |
Jose Angel Calvo Faraldo | Naturgy Generación SLU | |||||||||||
17:30-17:40 | International Sympsosium Presentation |
Long-term behaviour analysis of Santa Luzia dam affected by concrete swelling reactions using machine learning techniques |
Juan Mata | Laboratório Nacional de Engenharia Civil | |||||||||||
17:40-17:50 | International Sympsosium Presentation |
Intelligent management and control system of concrete dam construction |
Guoyuan Lan | CHINA GEZHOUBA GROUP CO.,LTD. | |||||||||||
17:50-18:00 | Discussion |
Discussion |